on 06 Sep 2022
Last Applicant/ Owned by
Shawan Town,Panyu District
Guangzhou City
CN
510000
Serial Number
90786617 filed on 21st Jun 2021
Registration Number
6836949 registered on 06th Sep 2022
Filing Basis
1. use application currently
Disclaimer
NO DATA
The mark consists of the stylized wording and number "90 DAYS HYDRO". The stylized number "90" is positioned to the left of the stylized stacked wording "DAYS HYDRO". A design of a curved arrow extends from the number "9" and five single line designs are positioned around the stylized number "0". The colors black and white represent background, outlining, shading, and transparent areas and are not Read More
Lamps; Electric bulbs; Electric lamps; Flashlights; Germicidal lamps for purifying air; Incandescent lamps; LED (light emitting diode) lighting fixtures; Light bulbs; Lighting apparatus, namely, lighting installations; Luminous tubes for lighting; Ultraviolet ray lamps, not for medical purposes; Electric light bulbs; Light bulbs, electric
24th Apr 2021
24th Apr 2021
No 90786617
No Service/Collective Mark
No
No
No
No
No
No
No
No
No
01.15.25 -
Other natural phenomena and observable events
24.15.03 -
Arrows formed by words, letters, numbers or punctuation
27.03.05 -
Representations of objects forming letters or numerals, including punctuation
The mark consists of the stylized wording and number "90 DAYS HYDRO". The stylized number "90" is positioned to the left of the stylized stacked wording "DAYS HYDRO". A design of a curved arrow extends from the number "9" and five single line designs are positioned around the stylized number "0". The colors black and white represent background, outlining, shading, and transparent areas and are not claimed as features of the mark.
Status Date | Action Taken |
---|---|
06th Sep 2022 | NOTICE OF REGISTRATION CONFIRMATION EMAILED |
06th Sep 2022 | REGISTERED-PRINCIPAL REGISTER |
21st Jun 2022 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
21st Jun 2022 | PUBLISHED FOR OPPOSITION |
01st Jun 2022 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
17th May 2022 | APPROVED FOR PUB - PRINCIPAL REGISTER |
12th Apr 2022 | TEAS/EMAIL CORRESPONDENCE ENTERED |
12th Apr 2022 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
12th Apr 2022 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
01st Apr 2022 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |