on 10 Mar 2020
Last Applicant/ Owned by
BG-4000 Plovdiv
BG
Serial Number
79267818 filed on 12th Jul 2019
Registration Number
6004731 registered on 10th Mar 2020
Filing Basis
No Filing Basis
Disclaimer
NO DATA
The mark consists of the wording "MAGNEFIX" in black stylized font, next to "MM 93" in white stylized font inside a red quadrilateral with a red triangle above. Materials, not of metal, for construction, namely, non-metal composite panels; rigid pipes, not of metal, for building; pitch, tar, bitumen and asphalt; buildings, transportable, not of metal; monuments, not of metal MM NINETY THREE MAGN Read More
Chemical preparations used in industry, science and photography, and agriculture, horticulture and forestry except fungicides, herbicides, insecticides and parasiticides; unprocessed artificial resins, unprocessed plastics; fertilizers for the land; fire extinguishing compositions; tempering and soldering preparations; chemical substances, namely, chemical preparations for preserving foodstuffs; tan in the nature of tanning agents for use in the manufacture of leather
Paints, varnishes, lacquers; preservatives against rust and against deterioration of wood in the nature of coating; raw natural resins; metal foil for painting, decorating, printing, and art
Materials, not of metal, for construction, namely, non-metal composite panels; rigid pipes, not of metal, for building; pitch, tar, bitumen and asphalt; buildings, transportable, not of metal; monuments, not of metal
No 79267818
No Service/Collective Mark
No 5006.13
No
No
No
No
No
No
No
No
26.05.21 -
Triangles that are completely or partially shaded
26.13.21 -
Quadrilaterals that are completely or partially shaded
The mark consists of the wording "MAGNEFIX" in black stylized font, next to "MM 93" in white stylized font inside a red quadrilateral with a red triangle above.
Status Date | Action Taken |
---|---|
07th Aug 2020 | FINAL DECISION TRANSACTION PROCESSED BY IB |
16th Jul 2020 | FINAL DISPOSITION NOTICE SENT TO IB |
16th Jul 2020 | FINAL DISPOSITION PROCESSED |
10th Jun 2020 | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB |
10th Mar 2020 | REGISTERED-PRINCIPAL REGISTER |
04th Jan 2020 | NOTIFICATION PROCESSED BY IB |
24th Dec 2019 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
24th Dec 2019 | PUBLISHED FOR OPPOSITION |
18th Dec 2019 | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB |
18th Dec 2019 | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB |