tm logo
ACECLAMP SOLAR
Live/Registered
REGISTERED

on 30 Apr 2024

Last Applicant/ Owned by

87 Spring Lane

Plainville

CT

06062

Serial Number

90071122 filed on 24th Jul 2020

Registration Number

7374731 registered on 30th Apr 2024

in the Principal Register

Correspondent Address

Damian Wasserbauer WASSERBAUER LAW LLC

PO BOX 382

COLLINSVILLE, CT 06022

United States

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

ACECLAMP SOLAR

"SOLAR" ACE CLAMP SOLAR Metal hardware for rooves and buildings, namely, mounting systems comprised of mounts, anchors, brackets, end caps, fasteners, grounding washers, guard rails, L-brackets, metal bars, rails, mounting rails, slot nuts, snow fence, locking nuts, rods, roofing, wire management devices in the nature of metal clips, wire management brackets, wire management fasteners, roofing m Read More

Classification Information


Class [006]
Metal Products


Metal hardware for rooves and buildings, namely, mounting systems comprised of mounts, anchors, brackets, end caps, fasteners, grounding washers, guard rails, L-brackets, metal bars, rails, mounting rails, slot nuts, snow fence, locking nuts, rods, roofing, wire management devices in the nature of metal clips, wire management brackets, wire management fasteners, roofing membrane pads with integral metal mounting fasteners, roofing membrane pads with integral metal mounting brackets, corrugated metal brackets, and metal rail brackets which may be sold as a unit, depending on the specific nature of the roof or structure for which they are used


First Use Date in General

01st Feb 2021

First Use Date in Commerce

01st Feb 2021

Mark Details


Serial Number

No 90071122

Mark Type

No Service/Collective Mark

Attorney Docket Number

No TM1337US00

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Legal History


Show more

Status DateAction Taken
30th Apr 2024REGISTERED-PRINCIPAL REGISTER
30th Apr 2024NOTICE OF REGISTRATION CONFIRMATION EMAILED
27th Mar 2024NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
26th Mar 2024ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
18th Mar 2024STATEMENT OF USE PROCESSING COMPLETE
14th Mar 2024TEAS STATEMENT OF USE RECEIVED
14th Mar 2024USE AMENDMENT FILED
22nd Sep 2023NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED
21st Sep 2023SOU EXTENSION 5 GRANTED
21st Sep 2023CASE ASSIGNED TO INTENT TO USE PARALEGAL