tm logo
SHANTRA
Live/Registered
REGISTERED

on 19 Dec 2023

Last Applicant/ Owned by

FLAT/RM B, 17/F CNT TOWER

WANCHAI

HK

Serial Number

97318637 filed on 18th Mar 2022

Registration Number

7250414 registered on 19th Dec 2023

in the Principal Register

Correspondent Address

Prakash NAMA

121 MOORE ST

PRINCETON, NJ 08540

Filing Basis

1. intent to use

2. use application currently

Disclaimer

NO DATA

SHANTRA

Hammocks; ropes; sails; tents; general utility bags for commercial use; hanging mesh net used for storing sports balls; netting; packaging bags of textile material; tents for mountaineering or camping; wrapping or binding bands, not of metal The wording "SHANTRA" has no meaning in a foreign language. Color is not claimed as a feature of the mark. The mark consists of the stylized wording "SHANT Read More

Classification Information


Class [022]
Ropes, Cordage and Fiber Products


Hammocks; ropes; sails; tents; general utility bags for commercial use; hanging mesh net used for storing sports balls; netting; packaging bags of textile material; tents for mountaineering or camping; wrapping or binding bands, not of metal


First Use Date in General

04th Apr 2022

First Use Date in Commerce

04th Apr 2022

Mark Details


Serial Number

No 97318637

Mark Type

No Service/Collective Mark

Attorney Docket Number

No VM116804

44D Filed

No

44D Current

No

44E filed

No

44E Current

No

66A Filed

No

66A Current

No

Current Basis

No

No Basis

No

Design Code(s)

24.15.03 -

Arrows formed by words, letters, numbers or punctuation

26.17.09 -

Curved line(s), band(s) or bar(s)

27.03.01 -

Geometric figures forming letters or numerals, including punctuation

Description of Design Search

The mark consists of the stylized wording "SHANTRA" with the top line of the "T" being an arrow pointing to the right, and a curved band below the letter "T".

Legal History


Show more

Status DateAction Taken
19th Dec 2023REGISTERED-PRINCIPAL REGISTER
19th Dec 2023NOTICE OF REGISTRATION CONFIRMATION EMAILED
15th Nov 2023NOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED
14th Nov 2023ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED
11th Oct 2023CASE ASSIGNED TO INTENT TO USE PARALEGAL
11th Oct 2023STATEMENT OF USE PROCESSING COMPLETE
29th Sep 2023TEAS STATEMENT OF USE RECEIVED
29th Sep 2023USE AMENDMENT FILED
04th Apr 2023NOA E-MAILED - SOU REQUIRED FROM APPLICANT
07th Feb 2023PUBLISHED FOR OPPOSITION